WARNING:
JavaScript is turned OFF. None of the links on this concept map will
work until it is reactivated.
If you need help turning JavaScript On, click here.
This Concept Map, created with IHMC CmapTools, has information related to: Node_09a_prechecks for HFO Burning Preparations, Distilled Water Tank and Atmospheric Drain Tank at least 60%full, Prepare for HFO burning Required Scenario Boilers, Power Diesel Generator On, Boilers Both Boilers Pressure ~6Mpa, Power Turbo Generators Off, Prepare for HFO burning Required Scenario Distilled Water Tank and Atmospheric Drain Tank, Deaerator Guage Glass Reading 60 - 70mm, Boilers Both Boilers Firing on DO, Boilers Both Boilers Desuperheated Steam is Available, Power Emergency Generator Auto Stand-by, Prepare for HFO burning Required Scenario Power, Power Shore Power Off, Prepare for HFO burning Required Scenario Deaerator