WARNING:
JavaScript is turned OFF. None of the links on this concept map will
work until it is reactivated.
If you need help turning JavaScript On, click here.
This Concept Map, created with IHMC CmapTools, has information related to: Prepare Main Plant for Manoeuvring from Port Condition (Part3), PART 3 Reset the main turbine trips, repeat the ahead and astern movements to warm through the turbine to a superheat temperature approaching that of the boiler. After the turbine has been warmed through, turning in the manual mode, place the controls in the automatic mode, with the telegraph in the stop position, and allow the engine to continue to warm through on the auto-spin program., PART 3 Confirm control oil and lubricating oil pressures are normal, control oil and lubricating oil pressures are normal Using the controls in manual mode, repeat the ahead and astern movements to warm through the turbine to a superheat temperature approaching that of the boiler., the main turbine trips Using the controls in manual mode, repeat the ahead and astern movements to warm through the turbine to a superheat temperature approaching that of the boiler., ensure all the information concerning the above being carried out is recorded along with the times at which each section is completed. Inform bridge that the main engines are ready for use, bridge that the main engines are ready for use At standby, put the main turbine controls to bridge control mode and monitor their response as manouevring proceeds., place the controls in the automatic mode, with the telegraph in the stop position, and allow the engine to continue to warm through on the auto-spin program. As required by international rules, ensure all the information concerning the above being carried out is recorded along with the times at which each section is completed., put the main turbine controls to bridge control mode and monitor their response as manouevring proceeds. ???? The Main Turbine is Now Ready to Put to Sea