WARNING:
JavaScript is turned OFF. None of the links on this concept map will
work until it is reactivated.
If you need help turning JavaScript On, click here.
This Concept Map, created with IHMC CmapTools, has information related to: Node_10a_Precehecks_bofore_ChangeOver_to_HFO, Distilled Water Tank and Atmospheric Drain Tank Guage Glass Level ᡴ% full, To Change Over From DO to HFO Burning Required Scenario Distilled Water Tank and Atmospheric Drain Tank, Fuel Bunkers DO and HFO Settling Tanks Full, Deaerator Guage Glass Reading 60 - 70mm, To Change Over From DO to HFO Burning Required Scenario Water Bunkers, To Change Over From DO to HFO Burning Required Scenario Boilers, Boilers Heated HFO Supply Available, To Change Over From DO to HFO Burning Required Scenario Fuel Bunkers, Engine Room Bilges Clear With Bilge Pump On Auto Through OWS, To Change Over From DO to HFO Burning Required Scenario Deaerator, Water Bunkers All Full, Power Shore Power Off, To Change Over From DO to HFO Burning Required Scenario Power, Power Turbo Generators Off, Fuel Bunkers All Full, To Change Over From DO to HFO Burning Required Scenario Engine Room Bilges, Boilers Both On Low Fire, Control Air System Condition On, Power Diesel Generator On, Power Emergency Generator Auto Stand-by