WARNING:
JavaScript is turned OFF. None of the links on this concept map will
work until it is reactivated.
If you need help turning JavaScript On, click here.
This Concept Map, created with IHMC CmapTools, has information related to: To Secure for Dry Dock (Part1), main feed water valves, put the feed control to manual Open superheated steam vent valve., superheated and desuperheated steam master and intermediate valves Open superheated steam vent valve., gland steam make and spill valves Start up diesel generator and place on the switchboard in parallel with the in-use turbine generator., allow it to run light for a few minutes before stopping it. Close steam inlet and exhaust valves, Shut off the steam to the air heater. ???? PART 2, Stop the FD fan and close the vanes. ???? Shut off the steam to the air heater., main turbine boiler steam stop and warming through valves are shut. ???? Shut down the evaporators, diesel generator and place on the switchboard in parallel with the in-use turbine generator. Ensure main turbine boiler steam stop and warming through valves are shut., Trip one boiler Close superheated and desuperheated steam master and intermediate valves, Vessel Is at Finished With Engines And In a Live Condition Take one of the turbine generators off load, allow it to run light for a few minutes before stopping it., fuel oil and steam valves at the burner rail. ???? Stop the FD fan and close the vanes., superheated steam vent valve. Isolate fuel oil and steam valves at the burner rail., Trip one boiler Close main feed water valves, put the feed control to manual, Shut down the evaporators ???? Shut down the purifiers, steam inlet and exhaust valves Start up diesel generator and place on the switchboard in parallel with the in-use turbine generator., Shut down the purifiers ???? Trip one boiler, allow it to run light for a few minutes before stopping it. Close gland steam make and spill valves