WARNING:
JavaScript is turned OFF. None of the links on this concept map will
work until it is reactivated.
If you need help turning JavaScript On, click here.
This Concept Map, created with IHMC CmapTools, has information related to: Vessel into Live condition1.13, steam being supplied to the feed pump and turbine generator all the boiler drain and vent can now be closed in. Continue to raise steam pressure. with fuel and air under the control of the IAS. Check each sysytem is now operational and gradually change over all control sysytem to automatic and/or remote. Ensure sysytem and components that have been used are put back on stanby condition or isolated eg electric feed pump. emergency diesel generator etc If the vessel is in dry dock, or alongside a shore installation, electrical power may be supplied through the shore breaker. However, this is normally used for dry dock purposes when separate arrangement are made for cooling water supplies to air compressors/ refrigeration and air conditioning units., has taken the control of the boiler out of the flashing ramp to the normal control mode. The boiler should now be providing normal steam pressure to the turbine generator/ main feed pump/ and fuel oil heating etc. Unload and shutdown the main diesel generator. Vessel in LIve Condition, Having warmed through and drined the atomising steam sysytem, change the burner atomising to steam isolate the atomising air supply. With the boiler superheater being circulated steam being supplied to the feed pump and turbine generator all the boiler drain and vent can now be closed in. Continue to raise steam pressure. with fuel and air under the control of the IAS. Check each sysytem is now operational and gradually change over all control sysytem to automatic and/or remote. Ensure sysytem and components that have been used are put back on stanby condition or isolated eg electric feed pump. emergency diesel generator etc, is in dry dock, or alongside a shore installation, electrical power may be supplied through the shore breaker. However, this is normally used for dry dock purposes when separate arrangement are made for cooling water supplies to air compressors/ refrigeration and air conditioning units. the IAS has taken the control of the boiler out of the flashing ramp to the normal control mode. The boiler should now be providing normal steam pressure to the turbine generator/ main feed pump/ and fuel oil heating etc. Unload and shutdown the main diesel generator.