WARNING:
JavaScript is turned OFF. None of the links on this concept map will
work until it is reactivated.
If you need help turning JavaScript On, click here.
This Concept Map, created with IHMC CmapTools, has information related to: Node_17a_Precheck to Start Main Propulsion Turbine, Pre-Checks to be done Required Scenario Electrical Power, Electrical Power Turbo Generator 1 On Load, Boilers Boiler 1 & 2 Pressure, Electrical Power Emergency Generator Auto, Stand-by, Electrical Power Diesel Generator On Load, Electrical Power Shore Power Off, Engine Control Room Throttle to control Turbine Speed, Deaerator Full with guage glass reading Between 60~70 mm, Tanks Distilled Water Tank (DWT) About 60% full, Pressure About 6 Mpa Running on HFO supply, Pre-Checks to be done Required Scenario LO + Purifier, Pre-Checks to be done Required Scenario Deaerator, Condenser Condenser Vacuum Satisfactory and Cooling on, Electrical Power Turbo Generator 2 Off, Pre-Checks to be done Required Scenario Boilers, These prechecks are for the procedures using Engine Control Room Throttle, Pre-Checks to be done Required Scenario Tanks, Engine Control Room Throttle is part of the Engine Order Telegraph (EOT) Control Unit and requires hydraulic pressure from the throttle hydraulic pump in order to operate., Tanks Atmospheric Drain Tank (ADT) About 60% full, Pre-Checks to be done Required Scenario Condenser