WARNING:
JavaScript is turned OFF. None of the links on this concept map will
work until it is reactivated.
If you need help turning JavaScript On, click here.
This Concept Map, created with IHMC CmapTools, has information related to: Node_20_Precheck to Run the Simulator to Start Distiller, Tanks Atmospheric Drain Tank (ADT) About 60% full, Checks to be done Required Scenario Boilers, Pressure About 6 Mpa Running on HFO supply, Electrical Power Shore Power Off, Electrical Power Emergency Generator Auto, Stand-by, Electrical Power Turbo Generator 2 Off, Electrical Power Turbo Generator 1 On Load, Condenser Condenser Vacuum Satisfactory and Cooling on, Checks to be done Required Scenario Condenser, Simulator to Start Distiller Checks to be done, Boilers Boiler 1 Pressure, Tanks Distilled Water Tank (DWT) About 60% full, Checks to be done Required Scenario Electrical Power, Checks to be done Required Scenario Tanks, Deaerator Full with guage glass reading Between 60~70 mm, Boilers Boiler 2 Pressure, Electrical Power Diesel Generator On Load, Checks to be done Required Scenario Deaerator