WARNING:
JavaScript is turned OFF. None of the links on this concept map will
work until it is reactivated.
If you need help turning JavaScript On, click here.
This Concept Map, created with IHMC CmapTools, has information related to: Vessel into Live condition1.12, use the electric feed pump to maintain the boiler water level. With the boiler now being now being fired on HFO, the fuel pressure will require adjusting to maintain a stedy and safe pressure rise rate. Raise HFO temperature styeadily start the auxiliary sea water circulating pump to supply the auxiliary condenser. when the boiler pressure is at approximately 1.50kpa, ensure that the drains pump system is operating to the deaerator. Put one main feed pump into operation to maintain the boiler level. The turbine exhaust will go either to the deaerator or dump to the auxiliary condenser., the burner over to HFO and shut down the diesel oil supply as the steam pressure rises use the electric feed pump to maintain the boiler water level. With the boiler now being now being fired on HFO, the fuel pressure will require adjusting to maintain a stedy and safe pressure rise rate. Raise HFO temperature styeadily, to supply the auxiliary condenser. when the boiler pressure is at approximately 1.50kpa, ensure that the drains pump system is operating to the deaerator. Put one main feed pump into operation to maintain the boiler level. The turbine exhaust will go either to the deaerator or dump to the auxiliary condenser. put the auxiliary condenser condensate and main drain system into operation. Start one main vacuum pump, line up to the auxiliary conser and commence raising vacuum. Raise steam on the LPSG and put the sysyem in use, Isolating the emergency external desuperheater., Recirculate DO around the fuel rail until its temperature reaches approximately 70°C. Change the burner over to HFO and shut down the diesel oil supply, start up a turbine generator. the exhaust will dump to the auxiliary condenser. Unload the emergency diesel generator and parallel the turbine generator with the main diesel generator. ???? Part4, the auxiliary condenser condensate and main drain system into operation. Start one main vacuum pump, line up to the auxiliary conser and commence raising vacuum. Raise steam on the LPSG and put the sysyem in use, Isolating the emergency external desuperheater. At approximately 3.0Mpa start up a turbine generator. the exhaust will dump to the auxiliary condenser. Unload the emergency diesel generator and parallel the turbine generator with the main diesel generator.