WARNING:
JavaScript is turned OFF. None of the links on this concept map will
work until it is reactivated.
If you need help turning JavaScript On, click here.
This Concept Map, created with IHMC CmapTools, has information related to: Warming 1, Utilizing the bypass valves on the main valves SS01F and SS02F, over a minimum of 20 minutes check Main Steam Line is at Operating Pressure, a) BYPASS VALVES b) MAIN TURBINE WARMING stop Maneuvrability, Raising main steam line pressure to 6.0Mpa by Utilizing the bypass valves on the main valves SS01F and SS02F, over a minimum of 20 minutes, Loading arms have been disconnected and clear of the vessel start Raising main steam line pressure to 6.0Mpa, a) BYPASS VALVES b) MAIN TURBINE WARMING unless Chief Engineer indicates an MCR requirement *MCR refers to Maximum Continuous Rating of engine., Open fully the main stop valves SS01F and SS02F. and shut a) BYPASS VALVES b) MAIN TURBINE WARMING, Main Steam Line is at Operating Pressure proceed to Open fully the main stop valves SS01F and SS02F., Warming Through the Main Turbines Prior to Standby Leaving Port ensure Loading arms have been disconnected and clear of the vessel